SOLAR POWER GENERATION OVERVIEW

SAEL has contracted a total solar capacity of 382 MW across 11 projects (7 are Operational & 4 are Under-Construction which are near COD).

This includes an operating capacity of 212 MW and an additional 170 MW of capacity of committed/near COD.

An additional 300MW solar PV Module assembly plant is being set up in Punjab.

Solar-GM-1.jpg

SOLAR PROJECTS

Solar-SAEL1.png
Mahoba & Lalitpur, UP
power-plug-3546818.png
Checkmark_circle_edited.png
module-3169259_edited.png
inverter-3378323_edited.png
59.29 MW

Commissioned

Poly Crystalline

Central

Solapur, Maharashtra
power-plug-3546818.png
Checkmark_circle_edited.png
module-3169259_edited.png
inverter-3378323_edited.png
24.88 MW

Commissioned

Poly Crystalline

Central

DJI_0014_1_edited_edited.jpg
Chitrakoot, UP
power-plug-3546818.png
Checkmark_circle_edited.png
module-3169259_edited.png
inverter-3378323_edited.png
72.56 MW

Commissioned

Mono Crystalline

String

Rooftop Project
power-plug-3546818.png
Checkmark_circle_edited.png
module-3169259_edited.png
inverter-3378323_edited.png

21.5 MW

Commissioned

Poly & Mono Crystalline

String

Patiala, Punjab
power-plug-3546818.png
Checkmark_circle_edited.png
module-3169259_edited.png
inverter-3378323_edited.png

7.87 MW

Commissioned

Poly Crystalline

String

Karnataka
power-plug-3546818.png
Checkmark_circle_edited.png
module-3169259_edited.png
inverter-3378323_edited.png

6.03 MW

Commissioned

Poly Crystalline

Central

Maharashtra
power-plug-3546818.png
Checkmark_circle_edited.png
module-3169259_edited.png
inverter-3378323_edited.png

27.6 MW

Commissioned

 Mono Crystalline

String

Solar-SAEL1.png
Konch, UP
power-plug-3546818.png
Checkmark_circle_edited.png
module-3169259_edited.png
inverter-3378323_edited.png
46.4 MW

Near COD

 Mono Crystalline

String

DSC_0036_edited.jpg
Ellenabad, Haryana
power-plug-3546818.png
Checkmark_circle_edited.png
module-3169259_edited.png
inverter-3378323_edited.png
01 MW

Commissioned

Poly Crystalline

String

Punjab
power-plug-3546818.png
Checkmark_circle_edited.png
module-3169259_edited.png
inverter-3378323_edited.png
75 MW

Commissioned

 Mono Crystalline

String

Tokai-Imperial-Hydraulics-Bengaluru,-Karnataka.jpg
Mizoram
power-plug-3546818.png
Checkmark_circle_edited.png
module-3169259_edited.png
inverter-3378323_edited.png
21 MW

Near COD

 Mono Crystalline

String

SOLAR ENERGY

PROVEN EXECUTION CAPABILITIES

Project Selection and Monitoring

Multiple internal committees and teams are set up, to ensure rigorous project evaluation. In-house team in place, to consistently track asset performance.

Sustain Operational Efficiencies

Continuous refinement and enhancement of solar plant design and execution capabilities. Advanced monitoring, tracking, and predictive analytics technologies with operational applications.

Strong Development Capabilities

Vast relationships across business segments in the key states help in ensuring superior site selection. A strong local presence provides a better regulatory interface.

DJI_0055_edited.jpg

IN-HOUSE EPC AND O&M PRACTICES TO MINIMIZE COSTS & INCREASE EFFICIENCY

Dedicated Manpower and Supervisory Team

Dedicated team for regular cleaning of the module to ensure optimum generation. Pipeline with booster pumps installed all across the plant layouts to ensure faster cleaning of modules.

Implementation & Monitoring of Pre-approved Plan

Daily, Weekly, and Monthly monitoring tests for preventive maintenance of all plant equipment including electrical/mechanical/other to improve plant availability.

Designated Engineer for Evacuation

A Dedicated Engineer is assigned for regular monitoring of transmission line from plant to sub-station, to avoid any grid failure due to TL-related issues.

Advanced SCADA Technologies

Continuous monitoring of plant performance through SCADA and online monitoring systems, both at site and HO.

NEW ASSEMBLY LINE OF SOLAR MODULES

Setting up 300MW fully Automated Solar PV Module Assembly plant in Punjab.

State-of-the-art machinery from Italy 

Ability to produce Poly, Mono PERC, Bifacial, Twin Peak Modules 

First phase expected to be operational by Mar-22

Dedicated in-house R&D lab and Quality lab

High level automation to flexibility to customize module variety

Solar-GM-1.jpg